Record height in Rzeszów

fischer secures Poland’s tallest residential building, Olszynki Park

Record height in Rzeszów

With an architectural height of 220.67 meters, Olszynki Park sets new standards in Polish high-rise construction. The project takes the top spot from the previous record holder, Wrocław's Sky Tower (212 meters). The exceptional building height, construction volume and sophisticated architecture required anchoring solutions with maximum load-bearing capacity. Mechanical and chemical fastening systems from fischer ensure permanent load transfer in various base materials and reliably protect the building structure against dynamic forces.

Precision without compromise at extreme building heights

The construction of a high-rise building of this scale demands absolute dimensional accuracy from all planners and contractors. Safety-relevant components must function flawlessly under real construction site conditions.

„The choice of fastening technology is far more than an implementation detail – it is a key safety factor for the entire structure. That is why the companies responsible chose our proven systems, which are used wherever reliability and the consistent implementation of the plans are the highest priority.“ says Artur Hoffman, Country Managing Director of fischer Poland.

Project profile

Construction company
Reconal
Height
220.67 meters
Building
Olszynki Park (Poland’s tallest residential building)
Location
Rzeszów, Poland
fischer solutions used
Bolt anchors, injection mortar, consulting, preliminary design
Application area
Façade substructure (compensation for extreme wind loads)

Collaborative Partnership as a Success Factor

Large-scale projects can only succeed through reliable interfaces between manufacturers and installation companies. The executing company Reconal has been working closely with fischer for over a decade. Roman Kotuła, Project Manager at Reconal, reveals: „Two factors are crucial for us when deciding in favor of fischer: the high quality of the products and the comprehensive technical support – from installation optimization to assistance from fischer engineers with complex technical calculations.“ The close integration of both partners made a significant contribution to accelerating work processes and implementing the required quality standards on schedule.

Mastering extreme wind and suction loads

At great heights, enormous wind forces act on the façade. The direction and intensity of the loads vary continuously. Pressure and suction forces place particular stress on the façade elements and the intermediate areas between floors. Every anchorage must safely transfer these changing horizontal loads into the supporting structure. Improper fixings pose considerable risks to the building structure and the surrounding urban space. fischer systems provide the required structural safety throughout the entire service life.

Coordinated system solutions for reinforced concrete and aerated concrete

Due to the different building materials used in the structure, two specialized fischer fastening solutions were employed.

Secure heavy-duty anchoring in reinforced concrete: For load-bearing connections in concrete, those responsible selected the FAZ II Plus bolt anchor. The proven expansion anchor bears the full load immediately after installation. Its European Technical Assessments (ETAs) guarantee maximum installation safety. Thanks to numerous diameter variants and anchoring depths, the system adapted flexibly to the structural requirements.

Expansion pressure-free load transfer in aerated concrete: Due to its porous structure, a chemical system was suitable for aerated concrete. The FIS V Plus universal injection mortar fills the drill hole completely without voids. After curing, the mortar forms a high-strength bond with the building material. This prevents expansion pressure in the porous base material, protects against edge breakout and offers high resistance to dynamic loads and vibrations.

Record height demands precision
With a high-rise building of this scale, there is no room for chance.
Artur Hoffman, Regional Managing Director of fischer Poland

Cost-effectiveness through efficient installation

Standardized fastening solutions make everyday work on construction sites considerably easier. Structured technical documentation, easy-to-understand installation instructions and coordinated tools reduced the installation effort at Olszynki Park. The installation teams were able to carry out anchorages quickly, without errors and in a verifiable manner. This reduced installation times and ensured the project progressed on schedule.