More than 150 companies and research institutions with over 5,000 employees are primarily active in the fields of energy, mobility, and sustainability on the EUREF campus in Berlin-Schöneberg. Solutions for the energy transition are not only developed but also exemplified: Since 2014, the campus has met the CO2 climate targets for the year 2045, among other things through climate-neutral energy supply, an intelligent energy grid, and energy-efficient buildings.
Image: André Baschlakow, Berlin

Property Profile

Architect
EUREF Consulting Company
From 2018 to 2020, the house 23-24 was built on the 5.5-hectare urban district under the ownership of EUREF AG (Berlin). The responsible architect and client representative was EUREF Consulting Gesellschaft von Architekten und Ingenieuren mbH (Berlin). The general contractor commissioned was the WOLFF & MÜLLER Group headquartered in Stuttgart. The new building has a total area of around 18,000 square meters. Of this, GASAG AG, one of the leading energy service providers in the Berlin-Brandenburg region, uses about two-thirds as its new headquarters. The new occupant on the EUREF campus focuses its service range for gas, electricity, and heat supply primarily on renewable energies and efficient technologies.  Pioneering is also the sustainable, ventilated curtain wall facade of the new GASAG AG headquarters. Johannes Tücks, Vorstand EUREF AG and Chief Architect of the EUREF Campus Berlin and Düsseldorf, says: “Sustainable architecture must be considered in the details throughout the entire chain from production, durability, to dismantling and recycling! Here we as architects rely on partners who develop and offer convincing solutions for us.” 
Image: André Baschlakow, Berlin
This also includes fischer BWM fastening and substructure solutions, which firmly anchor the futuristic aluminum cladding of the modern building envelope in the supporting structure. On a facade area of a total of 5,000 m², panels made of Novelis FF2® colored aluminum with a thickness of 2 mm in various shades of gray were installed during the execution period from 2019 to 2020. The advantages of the material lie in the diverse design possibilities, but also in functionality. The FF2® panels impress with color and gloss retention, non-combustibility (A1), ease of installation, and cost-effectiveness. The material and color effect are very durable and the maintenance effort during building operation is low. As a consultant for the appropriate facade cladding, W. Hartmann & Co. (GmbH & Co. KG) headquartered in Oststeinbek was involved, a system house for aluminum. “The focus for the architect and builder was particularly on sustainability as well as cost-effectiveness with demanding design,” says Roman Meinhardt, who is responsible for architect consulting at W. Hartmann & Co. (GmbH & Co. KG). “Our facade cladding is geared towards these topics and we can provide relevant information.” 
Image: André Baschlakow, Berlin
For anchoring the aluminum panels, the fischer BWM aluminum substructure ATK 100 ZeLa was used vertically as the base substructure. The system enables thermal decoupling for increased energy efficiency and sustainability. The passivhaus-certified ZeLa bracket received the certificate "Passivhaus suitable component" from the Passivhaus Institute as an independent certification body. The certificate contains all the key values (localized thermal bridge loss coefficients) and documents the unique position of the support structure compared to conventional, typical wall constructions. On the base substructure ATK 100 ZeLa, the horizontal hat profile 601 was attached. The facade builders then fixed a vertically oriented hat profile, specially developed for the project, as the third layer of the substructure. This special construction allowed the vertical surfaces and pilasters made of aluminum to be securely anchored. Rivets were used to attach the facade panels. At the parapets, the aluminum panels were riveted directly. In addition to the smooth facade panels, edge parts were also installed on the cornices, which were fastened with the clip 107 from the ATK 100 system.
Image: André Baschlakow, Berlin
"Both our products and our services met the project's requirements. The special features of the order were that we delivered a custom customer solution and several, up to three-layer variants of substructure profiles to the construction site," says the responsible fischer BWM field service employee Michael Noack. "In addition to the suitable products, our services, with which we successfully supported our partners through various construction phases, also contributed to the successful cooperation." Jörg Granz, the project manager responsible for the commissioned facade construction company WF Bau GmbH (Magdeburg), adds: "fischer BWM supported us, among other things, with consulting and the development of the special solution as well as with customer- and project-specific calculations of the facade system." The very high degree of prefabrication of the facade system by fischer BWM also enabled an especially fast installation of the facade cladding, according to Jörg Granz. The facade builders of WF Bau GmbH (Magdeburg) installed the substructure and insulation from scaffolding. The cladding was attached from company-owned suspended platforms.
Image: WF Bau GmbH
Both our product and our service offerings met the requirements of the project. Special features of the order included that we delivered a customized customer solution and several, up to three-layer variants of substructure profiles to the construction site.
Michael Noack (fischer BWM Field Sales Representative)
The ventilated curtain wall fits the sustainable overall concept of the new building. The new GASAG AG headquarters has been designed as a KfW Efficiency House 55 with a very high energy standard. This means that the primary energy demand is only 55% and the transmission heat loss is only 70% of the maximum values permitted by the Energy Saving Ordinance. Factors here include triple glazing, thermal insulation, the use of smart metering (digital electricity meters to record electricity consumption), and locally generated renewable energy. Not only in building operation but also during the construction process, EUREF AG and its commissioned architects emphasized sustainability by minimizing emissions as much as possible. On the ground floor, there is a showroom on the energy transition for visitors. The two-story underground garage houses 140 parking spaces for cars as well as an additional 70 parking spaces and charging options for electric cars that residents can also use in the evenings and on weekends. In addition, changing rooms and showers for cyclists are connected to the garage. The roof surfaces and terraces have been greened. Visually and functionally, the facade integrates into the overall concept of Building 23-24 on the EUREF campus, where the future theme of sustainability meets a futuristic design.
Image: André Baschlakow, Berlin