Modern appearance with clever facade technology

fischer undercut and heavy-duty anchors secure the building envelope at the new construction of Delta Holding, Belgrade

Modern appearance with clever facade technology
Delta Holding is one of the most important economic factors in Serbia and one of the largest investors in the region. The holding company provides a variety of services, such as in the agricultural sector, real estate, and wholesale. Space for further growth is now created by the new headquarters. This includes a new office building, which was constructed from 2019 to July 2021. Fiber cement panels on its ventilated rain screen facade (VHF) ensure a modern and representative appearance. The developer was Delta House from Belgrade. The responsible planning and engineering office was Centroprojekt d.o.o from Belgrade. In addition, the construction companies Energoprojekt Visokogradnja a.d. from Belgrade and Dma Koping d.o.o. from Belgrade were commissioned.

Object Profile

Property Type
Office Building
Construction Period
2019 to July 2021
Developer
Delta House from Belgrade
Planning and Engineering Office
Centroprojekt d.o.o from Belgrade
fischer undercut anchors enable the secure anchoring of the facade panels, which is concealed from the outside. This ensures a harmonious building appearance. At the same time, the undercut anchors allow for easy and fast installation. The FZP II T PA version was used. This fischer Zykon plate anchor is specially designed for the concealed fixing of thin fiber cement facade panels and is therefore ideal for the application in Belgrade. The fischer FZP II was installed in the versions FZP II 11 x 5 M6/T/11 PA and FZP II 11 x 5 M6/T/13 PA.
“Nails and screws are visibly apparent when fastening fiber cement boards on the facade. It is different when using our Zykon board anchor FZP II T PA. Here, the fastening points are concealed on the facade viewing side,” says Alen Ilic, Technical Advisor at the Austrian national company of the fischer Group. “This is made possible by the form-fitting and completely expansion pressure-free fastening in the conically undercut drilled hole. Thanks to its short geometry and other technical refinements, the FZP II T PA can be used in thin boards from 8 mm thickness.”
During the construction of the new office building at the headquarters of Delta Holding, the anchor was used here with a 5 mm embedment depth in approximately 8 mm fiber cement boards from SwissPearl. By setting the anchors on the back of the panels using undercut technology, the position in the facade panel can be optimally selected from a static perspective. This prevents deflection of the fiber cement panels. The form-fit and expansion pressure-free anchoring, together with the statically optimal fastening of the anchors, ensures high holding forces and enables the use of large panel formats. For the drilling work with CNC drilling systems, fischer undercut drills FZPB 11T CNC-DIA from the fischer total system for VHF fastening were used. These ensure optimal cutting behavior through polycrystalline diamonds, are part of the fischer FZP II undercut anchor approval, and are suitable for drilling in panel materials (HPL, fiber cement, etc.) using dry drilling methods.
We convinced our clients also because we are already firmly established as experts in the field of complete systems for VHF. In addition, we benefited from the recommendation by SwissPearl as well as from the good contact with planners and the construction company.
Alen Ilic (Technical Advisor at the Austrian national company of the fischer group)

To securely transfer the loads of the facade substructure into the concrete supporting structure, the fischer bolt anchor FBN II 12/10 made of stainless steel was also used. The heavy-duty anchor allows attachments to be carried out particularly economically. Its long thread and two anchoring depths also enable flexible use. 

Alen Ilic says: „We also convinced our clients because we are already firmly established as experts in complete systems for VHF. Additionally, we benefited from the recommendation by SwissPearl as well as from the good contact with planners and the construction company.“ In addition to the appropriate product solutions, the fastening specialist also supports his clients with comprehensive services. Alen Ilic summarizes: „We successfully accompanied our customers through various construction phases from planning and consulting to on-site support during construction, through to the successful execution of assembly and project completion.“ 

cd-green-55965cdb4b-wxzqd