Unclouded marble shine - thanks to invisible fastenings

fischer special anchors reinforce Zurich commercial building facade

Unclouded marble shine - thanks to invisible fastenings
The retail store in Zurich, especially located on the prestigious Bahnhofstrasse, is an important location for the Bucherer Group originating from Lucerne. As the world's largest luxury watch and jewelry retailer with 36 locations in Europe and 32 stores in the USA, the owners made a statement with the renovation of the premium location store building.
Image: Natursteine Wüst AG

Property Brief

Architect
Office Haratori from Zurich and Office Winhov from Amsterdam
Facade
consisting of 100 different steel tube lattice constructions
Property type
Commercial building of the luxury watch and jewelry retailer "Bucherer"
The design was created by the Zurich architectural firm Office Haratori and the architects of Office Winhov from Amsterdam. The planners succeeded in expressing the client's field of activity also in the architecture. The renovation of the building and the newly executed marble facade in 2017/2018 integrate the commercial building into its surroundings. In addition, the renovated commercial building simultaneously represents solidity, timelessness, innovation, and perfection—the "core business of the Bucherer company," according to the architects. While the ground floor is entirely dedicated to the material bronze, the carefully arranged marble slabs characterize the upper floors. The stone comes from the only marble quarry in Switzerland, located in the canton of Ticino. "We refine the marble from the Vallemaggia into precisely crafted, jewel-like elements," says the Office Haratori about the design. "The facade becomes—similar to a sundial—a reflection of the ongoing daily and seasonal changes. The marble relief appears in the changing shadow play, sometimes softly flat, then sharply defined and orderly."
Image: Natursteine Wüst AG
The facade, which now creates different moods depending on the incidence of light, meant a lot of work for the structural engineers at blesshess AG from Lucerne. The building envelope also posed a challenge for the planning and execution participants. Prof. Dr. Alfred Stein, the engineering office for fastening technology IBT GmbH (Thür), and Medzech Ingenieure GmbH (Bad Homburg) were heavily involved in the facade design and planning. Luchsinger & Partner GmbH (Quarten, Switzerland) and Natursteine Wüst AG (Wallisellen, Switzerland) also planned and realized the professional prefabrication and assembly of the facade.
Image: Luchsinger & Partner GmbH
The facade consists of approximately 100 different steel tube lattice structures, equipped with conically tapered marble pieces ranging from 6 to 18 cm thick in various sizes. These components were prefabricated into elements in the factory. Later, they were hung on site in blind assembly on 6 to 8 pins. The individual weight was up to 4.5 tons. Placing such heavy elements with a non-centric center of gravity so precisely that all pins are hit was a great challenge. Especially since the steel elements were not flat but deformed up to 10 mm, which is unavoidable in steel construction. Only with a suspension device specially designed for these elements could this hurdle be overcome. The business unit fischer Facade Systems of the fischer Group was responsible for fixing the marble slabs onto the steel structure using undercut technology. The undercut holes were drilled with a tolerance of less than 1 mm. This meant considerable effort, as Steven-Henrik Maier, Market Manager of fischer Facade Systems, reports. "Challenges arose regarding the high loads due to the weight of the slabs, which were up to 180 mm thick. Several pull-out tests were necessary to prepare for correct and safe execution." The tests were carried out with different slab thicknesses (30, 40, 60, 80 mm), also near the edge and with larger slab formats. As a result, to be able to transfer the loads, a special anchor with greater embedment depth was designed.
Image: Luchsinger & Partner GmbH
Challenges arose due to the high loads resulting from the self-weight of the plates up to 180 mm thick. To prepare for the correct and safe execution, several pull-out tests were necessary.
Steven-Henrik Maier, Market Manager fischer Facade Systems

The fischer solution convinced planners and engineers in multiple ways. From an aesthetic perspective, the ability to fasten the panels invisibly was decisive. Additionally, only in this way could the desired 2-mm joints be executed in the element center. Added to this were the high load capacity, the technical support, and the willingness to find and manufacture a solution tailored individually to the project. This consisted of fischer Zykon panel anchors FZP II in the special version 13 x 25.5 M8/18 Carbon, of which approximately 10,000 units were installed.

The architects from Haratori find the fitting words for the result, paraphrasing Le Corbusier, and describe it as a “artful, precise, and magnificent play of the surfaces gathered under the light.”

 