On the safe track through Copenhagen

fischer fastening solutions in the Metro Cityringen

On the safe track through Copenhagen
Already nearly 65 million passengers per year use the Copenhagen metro network, according to information from the owner and operator Metroselskabet I/S. And the influx of new citizens to the Danish capital is high. Since 2011, the Cityringen has been under construction, which is scheduled to open at the end of 2019. The underground rapid transit system will connect the Danish Parliament, the City Hall, significant national monuments, the central station, and other key areas of the city. It also offers transfer options to the existing lines M1 and M2 as well as to the S-Bahn and regional trains. The Cityringen will serve 17 new metro stations on the M3 line.

Property Profile

Builder
Metroselskabet I/S
Construction Period
2011 - 2019
Object type
underground rapid transit system
As a construction company, the client Metroselskabet I/S commissioned the Copenhagen Metro Team, a joint venture of three Italian companies: Tecnimont Civil Construction, Salini S.p.a. and Seli. In 2014, Salini and Impregilo merged into a group, which now owns 99.9% of the shares in the Copenhagen Metro Team. The drilling work for the double-tube tunnel system has already been completed. Using EPB-TBM tunneling, two tubes each with a diameter of 5.78 m were drilled 15.5 km long and 25 m deep underground through Copenhagen limestone.
With over 300 subcontractors, the Cityringen is one of the largest metro construction projects in Europe. The fischer Group is also involved in the project, providing numerous product solutions for temporary and permanent fastenings and installations and supervising their assembly on site. The tunnel structure consists of concrete and reinforced concrete as well as precast segments as the supporting structure.
The fastening and installation systems used have been tested according to European and international standards. They mostly have ETA (European Technical Approval) as well as UL and ICC certification for the USA and Far Eastern countries. The fastening and installation systems are made of high-quality materials such as stainless and highly corrosion-resistant steel and are resistant to fire, seismic influences, as well as dynamic and impact loads. Marco Cannone, project manager for international construction projects at fischer Italy, is significantly involved in project supervision. He is confident: "We convinced our clients with our suitable solutions and special developments that arose during the construction of the tunnel." And further: "But also with our service from the design and calculation of appropriate systems up to support during assembly on the construction site, we scored with planners and contractors."
Temporary channels, cables and pipes for ventilation, lighting as well as water supply and drainage are fastened in the city rings with the fischer nail anchor FNA II and the concrete screw FBS according to the respective load requirement. Both products allow for disassembly. The FNA II was also used to secure the drainage pipe against buoyancy on the tunnel floor with the pre-drilled metal brackets. This prevents the drainage from shifting from its original position when the section is filled with cement. Further areas of application for the FNA II included fastening the fire protection boards and, together with washers and spacers, attaching the reinforcement meshes for the sprayed fire protection plaster.
The stainless steel version of the FBN II serves to press the sealing membranes of the tunnel segments in the area of the wall penetration of the stations watertight. For permanently secure electrical installation in the Cityring, the fischer bolt anchors FAZ II and FBN II as well as the nail anchor FNA II are installed. A rail fastening system from fischer is used to attach rails to railway sleepers. To fix the current rails (3rd rail), the fischer epoxy mortar FIS EM is used along with the anchor rod FIS A, safely transferring high loads even at shallow drill depths into the anchoring substrate.
With our service ranging from the design and calculation of suitable systems to support during installation on site, we scored points with planners and contractors.
Marco Cannone, Project Manager for International Construction Projects at fischer Italy
For fastening the facade cladding in the stations with natural stone and handmade bricks, fischer ACT undercut anchors and substructures are used, which are suitable for claddings made of any materials. Loads are introduced form-fit and therefore completely free of expansion pressure with the systems. The corrosion-resistant and fire-tested fischer installation systems secure the pipes and cables for the supply and disposal of the tunnel with electricity and water as well as ventilation and exhaust. In addition, the entire fischer Firestop system is installed. The large range of solutions for passive fire protection helps to minimize the spread of fire, smoke, and toxic gases.
Under the direction of Metroselskabet, a total of 42 kilometers of tunnel are to be bored beneath Copenhagen and 24 modern subway stations built. Together with a tram project in the outskirts of Copenhagen, the opening of more than 50 metro and light rail stations is planned for the years 2019 - 2024.