fischer heavy-duty fasteners in Guiyang Metro Line 1

fischer heavy-duty fasteners in Guiyang Metro Line 1
The Guiyang Metro Line 1 was under construction from 2014 to 2018. Upon completion, it will run from the northwest to the south of the capital of the southwestern Chinese province of Guizhou. The route will include a total of 24 stations over a length of 34 km.

"During the construction of the subway, those involved faced complex geological and hydrological conditions as well as natural disasters such as earthquakes," describes Jiang Zong, Managing Director of fischer China, the framework conditions. "Therefore, it was important to select high-quality products that meet the high requirements. After intensive consultation, the experts quickly recognized the great advantages of fischer's products and services." The specialist partners benefited from the all-in-one solutions with which all fastening tasks could be carried out safely, economically, and installation-friendly. This included the installation of electrical lines, communication systems, protective doors, and fire extinguishing systems. In total, the installers used the fischer injection mortar FIS HB about 60,000 times with the powerful expanding anchor FHB to fix the brackets of the contact network for the power supply of electric vehicles and stationary facilities. The system achieves the highest load values in cracked concrete, which means fewer fastening points and smaller anchor plates are needed.
The fischer Zykon undercut anchor FZA was used with approximately 660,000 sets to secure the mounts for the ring network and communication systems. Its special undercut technology ensures secure connections and maximum safety. After inserting the anchor, the expansion sleeve is driven over the cone with the corresponding setting tool, filling the undercut borehole securely. Another 20,000 FZA anchors were installed by the installers to mount the fire extinguishing systems. The fischer internal thread anchor RG M was used 12,000 times in combination with the injection mortar FIS EM to secure the protective doors. The system allows maximum load transfer in cracked concrete and is also approved for seismic applications.

Previously, fischer was already involved in several projects to expand the Beijing subway network. These included lines 6, 8, 9, 10, 14, 15, 16, the airport line, and also the subway line S1. The company also supported the construction and expansion of many other rail traffic routes in Beijing, Shanghai, Guangzhou, Shenzhen, Wuxi, Wuhan, Tianjin, Shenzhen, Ningbo, and other cities. With suitable product and service offerings, fischer, through its Chinese subsidiary, supports its customers in the Middle Kingdom throughout the entire construction process.

Project Fact Sheet Guiyang Metro Line 1

Client:
Guiyang Urban Rail Transit Co., Ltd.
Construction Company:
No.5 Engineering Corporation Limited of CR20G
Architect / Planner:
China Railway No. 2 Engineering Group Co., Ltd.
Installation Companies:
China Railway 11th Bureau Group Electric Engineering Co., Ltd. Beijing Dinghan Technology Co., Ltd. China CREC Railway Electrification Engineering Co., Ltd.